News & field notes
Product news and notes from the job site — how Ask Donnie reads the code, prices the work, and keeps it honest.
How to do a wall framing takeoff
Wall lengths, stud spacing, plates, corners, headers and sheathing. A wall framing takeoff that turns a floor plan into a lumber list you can check.
How to do a flooring takeoff for LVP and tile
Room areas, waste by layout, cartons or tiles, then underlayment, transitions and trim. A flooring takeoff for luxury vinyl plank and tile, with the math shown.
How to estimate an interior paint job
Paintable wall and ceiling area, coats, coverage per gallon, then trim, doors and prep. A painting takeoff that turns a floor plan into gallons and labor lines.
Concrete takeoff: how to estimate a slab
Cubic yards of concrete, gravel base, vapor retarder, rebar and forms for a slab on grade. A concrete takeoff with the formulas and a worked example.
How to do a roofing takeoff from a plan
Footprint, pitch factor, squares, bundles, then the linear items: ridge, hip, drip edge, valleys and ice barrier. A shingle roofing takeoff you can check by hand.
How to do a drywall takeoff, step by step
Count drywall the way a hanger does: net wall and ceiling area, sheet size, waste, then mud, tape, screws and corner bead. A step-by-step takeoff with the math shown.
Deck ledger attachment code basics (IRC R507)
How the IRC wants a deck ledger fastened to the house: lag screws or bolts, the band joist, flashing, lateral-load hold-downs, guards, and the line items to price.
Change order checklist: what to include on the form
A field-ready checklist of what every change order should carry: scope, line items to price, schedule days, the revised contract sum, permit impact and signatures.
How to estimate a bathroom remodel: line items checklist
A bathroom remodel estimate is a list of line items to price, and the code drives several of them. A trade-by-trade checklist with the IRC sections behind each one.
Basement bedroom egress window requirements (IRC R310)
A basement bedroom needs an emergency escape and rescue opening. The IRC R310 sizes, sill height, window well and ladder rules, plus the line items to price.
Why your annual plan pays you monthly
Annual plans are cheaper, but handing a whole year of wallet credit out on day one makes cancellations and plan changes unfair in one direction or the other. Here is exactly how Ask Donnie's annual billing works instead - in installments, in proportion, in the open.
New: the $29 Foreman tier, 23 free calculators, share links & more
A big shipping week: a $29/mo tier that puts your logo on the everyday paperwork, 23 free construction calculators each on its own page, 8 free document generators, shareable estimate links, and honest annual billing.
Ask Donnie is on iPhone & iPad — Android on the way
The construction consultant that gives code references to verify against your local code, and prices the job, is now on iPhone and iPad. See pricing. Android is on the way.
Cost vs. price: how contractors actually put a number on a job
Homeowners see one number; contractors build it from several. Here's the difference between what a job costs and what it's priced at — and why a good estimate shows its work.
What a documented construction estimate shows
A real estimate isn't a guess with a dollar sign on it. It states its assumptions, its accuracy, and what it leaves out — so the number survives the first hard question.
Do I need a building permit? Start here.
The honest answer is 'ask your building department' — but here's how to think about it, what skipping a permit really risks, and the questions to ask before you start.
Why the same code question has different answers in different towns
Two builders, two correct answers, one question. It's not that one of them is wrong — it's that building codes are local in a way most people don't realize.
How to read a construction estimate without getting lost
Line items, allowances, contingency, markup, exclusions — a quick field guide to the parts of an estimate so you know what you're actually agreeing to.
Change orders done right: keeping a job clean as it changes
Every job changes. The difference between a smooth project and a dispute is how those changes get written down — before the work happens, not after.
Homeowners: how to ballpark a project before you call a contractor
You don't need a contractor to get a rough sense of scope and cost. A little homework up front makes every conversation that follows shorter, cheaper, and more honest.