What is a submittal?
A submittal is the documentation a contractor provides — product data, shop drawings, samples — for the design team to review against the specifications before installation.
Submittals confirm that what will actually be installed meets the specified requirements. The reviewer marks them (for example, approved or revise-and-resubmit); they verify conformance, they don't redesign the work.
An AI or system can flag a possible deviation, but only a human review formally approves a submittal.
Related terms
- RFI (request for information) — A request for information (RFI) is a formal question from the contractor to the design team to clarify or resolve something unclear in the drawings or specifications.
- Change order — A change order is a written, signed agreement that modifies the contract's scope, price, or schedule after work has begun.
- Punch list — A punch list is the list of remaining or deficient items a contractor must complete or correct before a project is considered finished.
Where it comes up on a job