What is an AACE estimate class?

AACE estimate classes (Class 5 to Class 1) describe how mature and accurate an estimate is, based on how complete the project's design is. Estimate classes based on AACE guidance; not AACE-endorsed.

A Class 5 estimate is early and rough (wide accuracy range); a Class 1 is detailed and tight, built from near-complete documents. The class sets honest expectations for how much the final cost could vary.

Stating an estimate's class and accuracy range — rather than a single false-precision number — is a hallmark of a professional estimate.

Related terms

  • Basis of estimate (BOE) — A basis of estimate (BOE) is the documented set of assumptions, inclusions, exclusions, and data sources behind an estimate — the 'show your work' for a number.
  • Takeoff (quantity takeoff) — A takeoff is the process of measuring and counting the materials and quantities needed for a project directly from the drawings — the basis of an estimate.
  • Overhead and profit (O&P) — Overhead and profit (O&P) is the markup added to the direct cost of a job to cover a contractor's business costs (overhead) and earnings (profit).

Where it comes up on a job

Put it to work

Get answers with code references to verify against your local code, and an estimate priced from your quantities and unit costs. See pricing.

Ask Donnie →

General information to help you understand industry terms — not legal or professional advice. Confirm code and contract specifics with your local building department (AHJ) and a licensed professional.